Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Aug 26, 2022     45-6 Cabin Doors and Transparency Step 3A-3d - (6 hours)       Category: Fuselage
Final trimming for the canopy. Slightly enlarged the holes in the reinforcement plates for the bolts. Tested again the fitting (total 4 times).
Mixed epoxy and flox and applied to the bottom reinforcement plates of the canopy and of the doors (not sure is necessary, but is not a big deal). I also primed the shims and installed below the door back hinge on the left door.
with the excess epoxy i filled few imperfections on the left door.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.